Linak MEDLINE MJB Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
7
Before installation, re-installation, or troubleshooting
Stop the application
Switch off the power supply and pull out the mains plug.
Relieve the application of any loads, which may be released during the work.
Before start-up
Make sure that the system has been installed as instructed in the User Manual.
Make sure that the voltage of the control box is correct before the system is
connected to the mains.
System connection. The individual parts must be connected before the control
box is connected to the mains.
During operation
Ensure that the cables are not damaged.
Unplug the mains cable on mobile equipment before it is moved.
Information on the MJB
The MJB Modular Junction Box is designed for use together with OpenBus™
control boxes.
The MJB makes it possible to connect multiple handsets, attendant controls or it
makes it possible to use the MJB as a control unit for 3
rd
party products as Out of
Bed detection, USB charger, Under Bed Light etc.
LINAK A/S delivers only the OpenBus system and is not responsible for any
products other than LINAK products (i.e. products from 3
rd
party suppliers) or
the compliance of such products with the LINAK OpenBus
TM
system.
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Comentarios a estos manuales

Sin comentarios